This project was the first Leeds v 4.0 in the state of VA. It was very difficult considering most manufacturers had not even started the process of getting Environmental Product Declarations, or Corporate Sustainability Reports which both were required. We used Spray Foam as the primary air barrier, but used Silicone around the curved roof edge making all of the connections very complex.
Name of Architect: | HDR Architecture | Type of Project: | Medical Office Building |
General Contractor / Construction Manager: | WM Jordan | Wood, Ryan HoggeValue ($$): | $22,000,000 |
Actual Installers of the Air Barrier: | Willie Boettcher, Barrett Worley, Chris | Project size: Size of building in total (sq. ft.): | 67,267 |
Project Location: | 1924 Landstowne Centre Way VA Beach, VA 23456 | Amount of air barrier installed (sq. ft.): | 30,000 |