ABAA Evaluated Air Barrier Materials
Self Adhered Sheet Membranes Section 072726
Carlisile Coatings & Waterproofing www.carlisleccw.com
CCW-705
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00 L/(s • m2) @ 75 Pa [0.000 cfm /ft2 @ 1.57 psf] | 4.79 ng / Pa•s•m2 [0.083 US Perms] | 5.47 ng / Pa•s•m2 [0.095 US Perms] | 0.0222 L/(s • m2) @ 75 Pa [0.0044 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Fire Resist 705 FR-A
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00016 L/(s • m2) @ 75 Pa [0.000032 cfm /ft2 @ 1.57 psf] | < 0.572 ng / Pa•s•m2 [[< 0.01 US Perms] | < 0.572 ng / Pa•s•m2 [< 0.01 US Perms] | 0.007 L/(s • m2) @ 75 Pa [0.0014 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Demilec www.demilec.com
Heatlok ABS
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
< 0.0005 L/(s • m2) @ 75 Pa [0.0001 cfm /ft2 @ 1.57 psf] | 0.89 ng / Pa•s•m2 [0.016 US Perms] | 1.8 ng / Pa•s•m2 [0.031 US Perms] | < 0.0022 L/(s • m2) @ 75 Pa | Air Barrier Master Specification |
Dörken Systems Inc. www.dorken.com
DELTA-VENT SA
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0015 L/(s • m2) @ 75 Pa [0.0003 cfm /ft2ÿ@ 1.57 psf] | 1763 ng / Pa•s•m2[30.9 US Perms] | 2830 ng / Pa•s•m2[49.5 US Perms] | 0.039 L/(s • m2) @ 75 Pa [0.0078 cfm /ft2@ 1.57 psf] |
Air Barrier Construction Design Details |
Grace Construction Products www.graceconstruction.com
Perm-A-Barrier® Wall Membrane
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.001 L/(s • m2) @ 75 Pa [0.0002 cfm /ft2 @ 1.57 psf] | 2.58 ng / Pa•s•m2 [0.05 US Perms] | 3.06 ng / Pa•s•m2 [0.05 US Perms] | < 0.004 L/(s • m2) @ 75 Pa [< 0.0008 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Henry Company www.henry.com
Blueskin® SA
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0002 L/(s • m2) @ 75 Pa [0.00004 cfm /ft2 @ 1.57 psf] | 2.0 ng / Pa•s•m2 [0.03 US Perms] | 49.0 ng / Pa•s•m2 [0.86 US Perms] | 0.006 L/(s • m2) @ 75 Pa [0.0012 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Soprema Inc. www.soprema.us
SopraSEAL Stick 1100T
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
< 0.0005 L/(s • m2) @ 75 Pa [0.0001 cfm /ft2 @ 1.57 psf] | 0.89 ng / Pa•s•m2 [0.016 US Perms] | 1.8 ng / Pa•s•m2 [0.031 US Perms] | < 0.0022 L/(s • m2) @ 75 Pa [< 0.0004 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
SoprSEAL STICK VP
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0024 L/(s • m2) @ 75 Pa [0.00048 cfm /ft2 @ 1.57 psf] | 614 ng / Pa•s•m2 [10.7 US Perms] | 978 ng / Pa•s•m2 [17.1 US Perms] | < 0.005 L/(s • m2) @ 75 Pa [< 0.001 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Tremco www.tremcosealants.com
ExoAir 110
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00005 L/(s • m2) @ 75 Pa [0.00001 cfm /ft2 @ 1.57 psf] | 1.15 ng / Pa•s•m2 [0.02 US Perms] | 1.26 ng / Pa•s•m2 [0.02 US Perms] | 0.1147 L/(s • m2) @ 75 Pa [0.02294 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
ExoAir 111
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
< 0.0005 L/(s • m2) @ 75 Pa [[< 0.0001 cfm /ft2 @ 1.57 psf] | 0.86 ng / Pa•s•m2 [0.01 US Perms] | 2.28 ng / Pa•s•m2 [0.04 US Perms] | 0.015 L/(s • m2) @ 75 Pa [0.003 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
W.R. Meadows, Inc. www.wrmeadows.com
Air Shield
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0015 L/(s • m2) @ 75 Pa [0.0003 cfm /ft2 @ 1.57 psf] | 1.01 ng / Pa•s•m2 [0.018 US Perms] | 2.697 ng / Pa•s•m2 [0.047 US Perms] | 0.0013 L/(s • m2) @ 75 Pa [0.00026 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Fluid Applied Membranes Section 072726
BASF Corporation – Construction Systemswww.master-builders-solutions.basf.us
MasterSeal® AWB 660 I (formerly Enershield I)
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0001 L/(s • m2) @ 75 Pa [0.0000 cfm /ft2 @ 1.57 psf] @ 26 mils (wet) | 5.53 ng / Pa•s•m2 [0.097 US Perms] @ 20 mils (wet) | 377 ng / Pa•s•m2 [6.58 US Perms] @ 20 mils (wet) | 0.0055 L/(s • m2) @ 75 Pa [0.0011 cfm /ft2 @ 1.57 psf] @ 10 mils wet |
Air Barrier Construction Design Details |
MasterSeal® AWB 660 (formerly Enershield HP)
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0002 L/(s • m2) @ 75 Pa [0.0000 cfm /ft2 @ 1.57 psf] @ 10 mils (wet) | 5.81 ng / Pa•s•m2 [0.10 US Perms] @ 10 mils (wet) | 1004 ng / Pa•s•m2 [17.6 US Perms] @ 10 mils (wet) | 0.0066 L/(s • m2) @ 75 Pa [0.00132 cfm /ft2 @ 1.57 psf] @ 10 mils wet |
Air Barrier Construction Design Details |
BASF Corporation – Wall Systemswww.wallsystems.basf.com
Senershield® VB
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0001 L/(s • m2) @ 75 Pa [0.0000 cfm /ft2 @ 1.57 psf] @ 26 mils (wet) | 5.53 ng / Pa•s•m2 [0.097 US Perms] @ 20 mils (wet) | 377 ng / Pa•s•m2 [6.58 US Perms] @ 20 mils (wet) | 0.0055 L/(s • m2) @ 75 Pa [0.0011 cfm /ft2 @ 1.57 psf] @ 10 mils wet |
Air Barrier Construction Design Details |
Finestop® VB
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0001 L/(s • m2) @ 75 Pa [0.0000 cfm /ft2 @ 1.57 psf] @ 26 mils (wet) | 5.53 ng / Pa•s•m2 [0.097 US Perms] @ 20 mils (wet) | 377 ng / Pa•s•m2 [6.58 US Perms] @ 20 mils (wet) | 0.0055 L/(s • m2) @ 75 Pa [0.0011 cfm /ft2 @ 1.57 psf] @ 10 mils wet |
Air Barrier Construction Design Details |
Senershield® R
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0002 L/(s • m2) @ 75 Pa [0.0000 cfm /ft2 @ 1.57 psf] @ 10 mils (wet) | 5.81 ng / Pa•s•m2 [0.10 US Perms] @ 10 mils (wet) | 1004 ng / Pa•s•m2 [17.6 US Perms] @ 10 mils (wet) | 0.0066 L/(s • m2) @ 75 Pa [0.00132 cfm /ft2 @ 1.57 psf] @ 10 mils wet |
Air Barrier Construction Design Details |
Acrostop® R
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0002 L/(s • m2) @ 75 Pa [0.0000 cfm /ft2 @ 1.57 psf] @ 10 mils (wet) | 5.81 ng / Pa•s•m2 [0.10 US Perms] @ 10 mils (wet) | 1004 ng / Pa•s•m2 [17.6 US Perms] @ 10 mils (wet) | 0.0066 L/(s • m2) @ 75 Pa [0.00132 cfm /ft2 @ 1.57 psf] @ 10 mils wet |
Air Barrier Construction Design Details |
Finestop® RA
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0002 L/(s • m2) @ 75 Pa [0.0000 cfm /ft2 @ 1.57 psf] @ 10 mils (wet) | 5.81 ng / Pa•s•m2 [0.10 US Perms] @ 10 mils (wet) | 1004 ng / Pa•s•m2 [17.6 US Perms] @ 10 mils (wet) | 0.0066 L/(s • m2) @ 75 Pa [0.00132 cfm /ft2 @ 1.57 psf] @ 10 mils wet |
Air Barrier Construction Design Details |
Carlisle Coatings & Waterproofingwww.carlisleccw.com
Barriseal-S/R
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0065 L/(s • m2) @ 75 Pa [0.0013 cfm /ft2 @ 1.57 psf] @ 46 mils (wet) | 9.411 ng / Pa•s•m2 [0.1647 US Perms] @ 46 mils (dry) | 48.745 ng / Pa•s•m2 [0.853 US Perms] @ 46 mils (dry) | 0.012 L/(s • m2) @ 75 Pa [0.00242 cfm /ft2 @ 1.57 psf] @ 65 mils (wet) |
Air Barrier Construction Design Details |
Barritech VP/ Barritech VP LT
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.001 L/(s • m2) @ 75 Pa [0.0002 cfm /ft2 @ 1.57 psf] @ 65 mils (wet) | 41.1 ng / Pa•s•m2 [0.719 US Perms] @ 60 mils (wet) [40 mils (dry)] | 817 ng / Pa•s•m2 [14.295 US Perms] @ 60 mi ls (wet) [40 mils (dry)] | 0.012 L/(s • m2) @ 75 Pa [0.00242 cfm /ft2 @ 1.57 psf] @ 65 mils (wet) |
Air Barrier Construction Design Details |
Fire-Resist Barritech NP
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.001 L/(s • m2) @ 75 Pa [0.0002 cfm /ft2 @ 1.57 psf] @ 80 mils (wet) [40 mils (dry)] | 2.86 ng / Pa•s•m2 [0.05 US Perms] @ 35 mils (dry) | 44 ng / Pa•s•m2 [0.77 US Perms] @ 35 mils (dry) | 0.1167 L/(s • m2) @ 75 Pa [0.0230 cfm /ft2 @ 1.57 psf] @ 80 mils (wet) |
Air Barrier Construction Design Details |
Dow Corningwww.buildabetterbarrier.com
DefendAir 200
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0049 L/(s • m2) @ 75 Pa [0.00098 cfm /ft2 @ 1.57 psf] @ 15 mils (dry) | 402.11 ng / Pa•s•m2 [7.03 US Perms] @ 15 mils (dry) | 1387.7 ng / Pa•s•m2 [24.26 US Perms] @ 15 mils (dry) | 0.00049 L/(s • m2) @ 75 Pa [0.000098 cfm /ft2 @ 1.57 psf] @ 28 – 34 mils (dry) |
Air Barrier Construction Design Details |
Dryvit Systems Inc.www.dryvit.com
Backstop NT
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0006 L/(s • m2) @ 75 Pa [0.000118 cfm /ft2 @ 1.57 psf] @ 12 mils (dry) | 4.30 ng / Pa•s•m2 [0.075 US Perms] @ 20 mils (dry) | 1810 ng / Pa•s•m2 [31.65 US Perms] @ 20 mils (dry) |
DuPont™www.fluidapplied.tyvek.com
Tyvek® Fluid Applied WB
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.001 L/(s • m2) @ 75 Pa [0.0002 cfm /ft2 @ 1.57 psf] @ 25 mils (dry) | 656 ng / Pa•s•m2 [11.48 US Perms] @ 25 mils (dry) | 1384 ng / Pa•s•m2 [24.23 US Perms] @ 25 mils (dry) | Air Barrier Construction Design Details |
Grace Construction Productswww.na.graceconstruction.com
Perm-A-Barrier VP
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.002 L/(s • m2) @ 75 Pa [0.0004 cfm /ft2 @ 1.57 psf] @ 69 mils (wet) | 34.39 ng / Pa•s•m2 [0.60 US Perms] @ 40 mils (dry) | 741.6 ng / Pa•s•m2 [12.9 US Perms] @ 40 mils (dry) | < 0.004 L/(s • m2) @ 75 Pa [< 0.000787 cfm /ft2 @ 1.57 psf] @ 90 mils wet |
Air Barrier Construction Design Details |
Perm-A-Barrier Liquid
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
< 0.001 L/(s • m2) @ 75 Pa [< 0.0002 cfm /ft2 @ 1.57 psf] @ 51 mils (dry) | 4.96 ng / Pa•s•m2 [0.09 US Perms] @ 60 mils (dry) | 5.15 ng / Pa•s•m2 [0.09 US Perms] @ 60 mils (dry) | < 0.004 L/(s • m2) @ 75 Pa [< 0.000787 cfm /ft2 @ 1.57 psf] @ 40 mils wet |
Air Barrier Construction Design Details |
Henry Companywww.henry.com
Air Bloc 31MR
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0012 L/(s • m2) @ 75 Pa [0.00024 cfm /ft2 @ 1.57 psf] @ 87 mils (wet) | 32.0 ng / Pa•s•m2 [0.57 US Perms] @ 44 mils (dry) | 2066 ng / Pa•s•m2 [36.12 US Perms] @ 44 mils (dry) | 0.004 L/(s • m2) @ 75 Pa [0.0008 cfm /ft2 @ 1.57 psf] @ 90 mils wet |
Air Barrier Construction Design Details |
Air Bloc 32MR
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0005 L/(s • m2) @ 75 Pa [0.0001 cfm /ft2 @ 1.57 psf] @ 118 mils (wet) | 13.0 ng / Pa•s•m2 [0.23 US Perms] @ 118 mils (wet) | 58 ng / Pa•s•m2 [1.02 US Perms] @ 118 mils (wet) | 0.0029 L/(s • m2) @ 75 Pa [0.00058 cfm /ft2 @ 1.57 psf] @ 75 – 115 mils wet |
Air Barrier Construction Design Details |
Air Bloc 33MR
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0008 L/(s • m2) @ 75 Pa [0.0016 cfm /ft2 @ 1.57 psf] | 19.0 ng / Pa•s•m2 [0.34 US Perms] @ 59 mils (dry) | 652 ng / Pa•s•m2 [11.4 US Perms] @ 59 mils (dry) | 0.0071 L/(s • m2) @ 75 Pa [0.0014 cfm /ft2 @ 1.57 psf] @ 100 mils (wet) [58 mils (dry)] |
Air Barrier Construction Design Details |
Hohmann & Barnard, Incwww.h-b.com
Enviro-Barrier
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0004 L/(s • m2) @ 75 Pa [0.00008 cfm /ft2 @ 1.57 psf] @ 40 mils (dry) | 3.40 ng / Pa•s•m2 [0.060 US Perms] @ 40 mils (dry) | 39.6 ng / Pa•s•m2 [0.694 US Perms] @ 40 mils (dry) | 0.0040 L/(s • m2) @ 75 Pa [0.0008 cfm /ft2 @ 1.57 psf] @ 50 mils (wet) |
Air Barrier Construction Design Details |
Kemper System America Inc.www.kemper-system.com
Wall Guardian® FW-100 Asphaltic-component
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0069 L/(s • m2) @ 75 Pa [0.001358 cfm /ft2 @ 1.57 psf] at 30 mils (dry) [60 mils (wet)] | < 5.72 ng / Pa•s•m2 [< 0.10 US Perms] @ 30 mils (dry) | 720 ng / Pa•s•m2 [12.6 US Perms] @ 30 mils (dry) | < 0.0022 L/(s • m2) @ 75 Pa [< 0.00043 cfm /ft2 @ 1.57 psf] @ 60 mils wet [35 mils dry] |
Air Barrier Construction Design Details |
Wall Guardian® FW-100-A Acrylic Based
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0005 L/(s • m2) @ 75 Pa [0.0001 cfm /ft2 @ 1.57 psf] at 20 mils (dry) | 55.3 ng / Pa•s•m2 [0.96 US Perms] @ 22 mils (dry) | 661 ng / Pa•s•m2 [11.5 US Perms] @ 22 mils (dry) | < 0.0022 L/(s • m2) @ 75 Pa [0.0004 cfm /ft2 @ 1.57 psf] @ 20 mils dry |
Air Barrier Construction Design Details |
Laticretewww.laticrete.com
Air and Water Barrier
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00052 L/(s • m2) @ 75 Pa [0.000104 cfm /ft2 @ 1.56 psf] @ 38 mils (wet) [25 mils (dry)] | 4.92 ng / Pa•s•m2 [0.086 US Perms] @ 35 mils (wet) [25 mils (dry)] | 57.3 ng / Pa•s•m2 [1.002 US Perms] @ 36 mils (wet) [26 mils (dry)] | 0.0017 L/(s • m2) @ 75 Pa [0.0003 cfm /ft2 @ 1.57 psf] @ 63 mils (dry) |
Air Barrier Construction Design Details |
Masonry Foams and Coatingswww.masonryfoamsandcoatings.com
Air Smart VP
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0005 L/(s • m2) @ 75 Pa [0.0001 cfm /ft2 @ 1.57 psf] @ 32 mils (wet) | 55.30 ng / Pa•s•m2 (0.96 US Perms) @ 22 mils (dry) | 660.80 ng / Pa•s•m2 (11.5 US Perms) @ 22 mils (dry) | 0.0022 L/(s • m2) @ 75 Pa [0.00044 cfm /ft2 @ 1.57 psf] @ 20 mils (dry) |
Air Barrier Construction Design Details |
Momentivewww.siliconeforbuilding.com/AWB
GE Elemax 2600
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.003 L/(s • m2) @ 75 Pa [0.0006 cfm /ft2 @ 1.57 psf] @ 17 mils (dry) | 453.02 ng / Pa•s•m2 (7.92 US Perms) @ 17 mils (dry) | 581.15 ng / Pa•s•m2 (10.16 US Perms) @ 17 mils (dry) | 0.0009 L/(s • m2) @ 75 Pa [0.0018 cfm /ft2 @ 1.57 psf] @ 19 mils (wet) |
Air Barrier Construction Design Details |
Parex USAwww.parexusa.com
Weatherseal
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
< 0.00001 L/(s • m2) @ 75 Pa [0.000002 cfm /ft2 @ 1.57 psf] @ 12 mils (wet) | 47.3 ng / Pa•s•m2 (0.828 US Perms) @ 30 mils (wet) | 526 ng / Pa•s•m2 (9.2 US Perms) @ 18 mils (wet) | 0.0548 L/(s • m2) @ 75 Pa [0.0108 cfm /ft2 @ 1.57 psf] @ 10 mils |
Air Barrier Construction Design Details |
Pecora Corpationwww.pecora.com
XL-Perm ultra VP
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0012 L/(s • m2) @ 75 Pa [0.00024 cfm /ft2 @ 1.57 psf] @ 12 mils (dry) | 653.22 ng / Pa•s•m2 (11.42 US Perms) @ 9 mils (dry) | 727.01 ng / Pa•s•m2 (12.71 US Perms) @ 9 mils (dry) | 0.0040 L/(s • m2) @ 75 Pa [0.0008 cfm /ft2 @ 1.57 psf] @ 14 mils (wet) |
Air Barrier Construction Design Details |
Polyguard Products Inc.www.poly-wall.com
Poly Wall AirLok Flex
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00195 L/(s • m2) @ 75 Pa [0.0039 cfm /ft2 @ 1.57 psf] @ 1gal/70ft2 | 3.32 ng / Pa•s•m2 (0.058 US Perms) @ 40 mils (wet), 20 mils (dry) | 12.5 ng / Pa•s•m2 (0.219 US Perms) @ 40 mils (wet), 20 mils (dry) | 0.004 L/(s • m2) @ 75 Pa [0.0008 cfm /ft2 @ 1.57 psf] @ 16 mils (dry) |
Air Barrier Construction Design Details |
Airlok Flex WG
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.000024 L/(s • m2) @ 75 Pa [0.0000048 cfm /ft2 @ 1.57 psf] @ 33 mils (wet) | 199.19 ng / Pa•s•m2 (3.49 US Perms) @ 10 mils (dry) | 1186.88 ng / Pa•s•m2 (20.77 US Perms) @ 10 mils (dry) | 0.011 L/(s • m2) @ 75 Pa [0.0022 cfm /ft2 @ 1.57 psf] @ 20 mils (wet) |
Air Barrier Construction Design Details |
Prosoco Inc.www.prosoco.com
R-Guard™ Cat 5
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0009 L/(s • m2) @ 75 Pa [0.00018 cfm /ft2 @ 1.56 psf] @ 12 mils (dry) | 859 ng / Pa•s•m2 (15.03 US Perms) @ 12-15 mils (wet) | 1015 ng / Pa•s•m2 (17.71 US Perms) @ 12-15 mils (wet) | 0.0107 L/(s • m2) @ 75 Pa [< 0.0021 cfm /ft2 @ 1.57 psf] @ 12 – 16 mils (wet) |
Air Barrier Construction Design Details |
R-Guard™ Fill
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0014 L/(s • m2) @ 75 Pa [0.0002 cfm /ft2 @ 1.57 psf] | 107 ng / Pa•s•m2 (1.87 US Perms) @ 27 mils (wet) | 480 ng / Pa•s•m2 (8.40 US Perms) @ 30 mils (wet) | 0.012 L/(s • m2) @ 75 Pa [0.00227 cfm /ft2 @ 1.57 psf] @ 32 – 63 mils |
Air Barrier Construction Design Details |
R-Guard™ Spray Wrap
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.000 L/(s • m2) @ 75 Pa [0.0000 cfm /ft2 @ 1.57 psf] @ 10-12 mils (wet) | 6.86 ng / Pa•s•m2 (0.12 US Perms) @ 12 mils (wet) | 202 ng / Pa•s•m2 (3.54 US Perms) @ 12 mils (wet) | 0.016 L/(s • m2) @ 75 Pa [0.00311 cfm /ft2 @ 1.57 psf] @ 10 – 20 mils (wet) |
Air Barrier Construction Design Details |
R-Guard™ Spray Wrap MVP
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.001 L/(s • m2) @ 75 Pa [0.0002 cfm /ft2 @ 1.57 psf] @ 26 mils (dry) | 311.74 ng / Pa•s•m2 (5.45 US Perms) @ 5 mils (dry) | 1944 ng / Pa•s•m2 (34.43 US Perms) @ 5 mils (dry) | 0.003 L/(s • m2) @ 75 Pa [0.0006 cfm /ft2 @ 1.57 psf] @ 10 mils (dry) |
Air Barrier Construction Design Details |
Protecto Wrapwww.protectowrap.com
Protecto Wall Liquid Air Barrier VP
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0043 L/(s • m2) @ 75 Pa [0.00086 cfm /ft2 @ 1.57 psf] @ 10 mils (dry) | 55.3 ng / Pa•s•m2 (0.96 US Perms) @ 22 mils (dry) | 660.8 ng / Pa•s•m2 (11.5 US Perms) @ 22 mils (dry) | 0.0022 L/(s • m2) @ 75 Pa [0.00044 cfm /ft2 @ 1.57 psf] @ 20 mils (dry) |
Sika Corp.usa.sika.com
Sikagard 530 Liquid Applied Vapor Permeable Air Barrier
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0005 L/(s • m2) @ 75 Pa [< 0.0001 cfm /ft2 @ 1.57 psf] @ 20 mils (dry) | 55.3 ng / Pa•s•m2 (0.96 US Perms) @ 22 mils (dry) | 661 ng / Pa•s•m2 (11.5 US Perms) @ 22 mils (dry) | < 0.0022 L/(s • m2) @ 75 Pa [< 0.00043 cfm /ft2 @ 1.57 psf] @ 20 mils (dry) |
Air Barrier Construction Design Details |
Sikagard 520 Liquid Applied Vapor Permeable Air Barrier
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0069 L/(s • m2) @ 75 Pa [0.0014 cfm /ft2 @ 1.57 psf] @ 30 mils (dry) | < 5.7 ng / Pa•s•m2 (< 0.1 US Perms) @ 30 mils (dry) | 720 ng / Pa•s•m2 (12.6 US Perms) @ 30 mils (dry) | < 0.0022 L/(s • m2) @ 75 Pa [< 0.00043 cfm /ft2 @ 1.57 psf] @ 60 mils (wet) [35 mils (dry)] |
Air Barrier Construction Design Details |
Sopremawww.soprema.us
Sopraseal LM 202 VP
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0002 L/(s • m2) @ 75 Pa [0.0000 cfm /ft2 @ 1.57 psf] @ 10 mils (wet) | 5.81 ng / Pa•s•m2 (0.10 US Perms) @ 10 mils (wet) | 1004 ng / Pa•s•m2 (17.6 US Perms) @ 10 mils (wet) | 0.0066 L/(s • m2) @ 75 Pa [0.00132 cfm /ft2 @ 1.57 psf] @ 10 mils (wet) |
Air Barrier Construction Design Details |
Sopraseal LM 203
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0001 L/(s • m2) @ 75 Pa [0.00002 cfm /ft2 @ 1.57 psf] @ 26 mils (wet) | 5.53 ng / Pa•s•m2 (0.097 US Perms) @ 20 mils (wet) | 377 ng / Pa•s•m2 (6.58 US Perms) @ 20 mils (wet) | 0.0066 L/(s • m2) @ 75 Pa [0.00132 cfm /ft2 @ 1.57 psf] @ 10 mils (wet) |
Air Barrier Construction Design Details |
Sto Corp.www.stocorp.com
EmeraldCoat
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00020 L/(s • m2) @ 75 Pa [0.00024 cfm /ft2 @ 1.57 psf] @ 20 mils (dry) | 121.26 ng / Pa•s•m2 (2.12 US Perms) @ 12 mils (dry) | 797.94 ng / Pa•s•m2 (13.95 US Perms) @ 12 mils (wet) | 0.0008 L/(s • m2) @ 75 Pa [0.00016 cfm /ft2 @ 1.57 psf] @ 10 mils (wet) |
Air Barrier Construction Design Details |
Gold Coat
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.000 L/(s • m2) @ 75 Pa [0.0000 cfm /ft2 @ 1.57 psf] @ 10-12 mils (wet) | 6.86 ng / Pa•s•m2 (0.12 US Perms) @ 12 mils (wet) | 202 ng / Pa•s•m2 (3.54 US Perms) @ 12 mils (wet) | 0.016 L/(s • m2) @ 75 Pa [0.00311 cfm /ft2 @ 1.57 psf] @ 10 – 20 mils (wet) |
Air Barrier Construction Design Details |
Gold Fill
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0014 L/(s • m2) @ 75 Pa [0.0002 cfm /ft2 @ 1.57 psf] | 107 ng / Pa•s•m2 (1.87 US Perms) @ 27 mils (wet) | 480 ng / Pa•s•m2 (8.40 US Perms) @ 30 mils (wet) | 0.012 L/(s • m2) @ 75 Pa [0.00227 cfm /ft2 @ 1.57 psf] @ 32 – 63 mils |
Air Barrier Construction Design Details |
VaporSeal
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.01623 L/(s • m2) @ 75 Pa [0.004 cfm /ft2 @ 1.56 psf] @ 32 – 48 mils (wet) | 2.52 ng / Pa•s•m2 (0.044 US Perms) @ 30 mils (dry) | 32.6 ng / Pa•s•m2 (0.57 US Perms) @ 26 mils (dry) | 0.011 L/(s • m2) @ 75 Pa [0.00215 cfm /ft2 @ 1.57 psf] @ 32 – 48 mils (wet) |
Air Barrier Construction Design Details |
TK Productswww.tkproducts.com
TK-AirMax 2102 (Non-Permeable), TK-AirMax 2102 (Non-Permeable VOC)
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.002 L/(s • m2) @ 75 Pa [0.0004 cfm /ft2 @ 1.57 psf] @ 40+ mils (wet) | 0.751 ng / Pa•s•m2 [0.013 US Perms] @ 20 mils (dry) | 6.29 ng / Pa•s•m2 [0.11 US Perms] @ 12 mils (dry) | 0.005 L/(s • m2) @ 75 Pa [0.0009 cfm /ft2 @ 1.57 psf] @ 32 mils wet |
Air Barrier Construction Design Details |
TK-AirMax 2103 (Water-Based)
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00492 L/(s • m2) @ 75 Pa [0.00097 cfm /ft2 @ 1.57 psf] @ 40 mils (wet) | 6.699 ng / Pa•s•m2 [0.117 US Perms] @ 19.3 mils (dry) | 857 ng / Pa•s•m2 [15.0 US Perms] @ 19.7 mils (dry) | 0.006 L/(s • m2) @ 75 Pa [0.0013 cfm /ft2 @ 1.57 psf] @ 32 mils wet |
Air Barrier Construction Design Details |
TK-AirMax 2104 (Water Base)
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.004 L/(s • m2) @ 75 Pa [0.0008 cfm /ft2 @ 1.57 psf] @ 40+ mils (wet) | 17.1 ng / Pa•s•m2 [0.3 US Perms] @ 12.1 mils (dry) | 1007 ng / Pa•s•m2 [17.6 US Perms] @ 14 mils (dry) | 0.024 L/(s • m2) @ 75 Pa [0.0047 cfm /ft2 @ 1.57 psf] @ 32 mils wet [22 mils dry] |
Air Barrier Construction Design Details |
Tremcowww.tremcosealants.com
ExoAir 230
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00011 L/(s • m2) @ 75 Pa [0.00030 cfm /ft2 @ 1.57 psf] @ 40 mils (wet) | 103.72 ng / Pa•s•m2 [1.81 US Perms] @ 29 mils (dry) | 1677 ng / Pa•s•m2 [29.31 US Perms] @ 29 mils (dry) | [0.01 cfm /ft2 @ 1.57 psf] @ 35 mils dry | Air Barrier Construction Design Details |
W.R. Meadows, Inc.www.wrmeadows.com
Air Shield LMP
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0011 L/(s • m2) @ 75 Pa [0.00022 cfm /ft2 @ 1.57 psf] @ 20 mils (dry) | 9.62 ng / Pa•s•m2 [0.168 US Perms] @ 47.6 mils (dry) | 598 ng / Pa•s•m2 [10.47 US Perms] @ 47.6 mils (dry) | 0.0026 L/(s • m2) @ 75 Pa [0.00052 cfm /ft2 @ 1.57 psf] @ 90 mils (wet) [45 mils dry] |
Air Barrier Construction Design Details |
Sprayed Polyurethane Foam (Medium Density Closed Cell) Section 072703
Accella Polyurethane Systemswww.baysealsprayfoam.com
ECOBAY CC, ECOBAY CC POLAR
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00011 L/(s • m2) @ 75 Pa [0.000023 cfm /ft2 @ 1.57 psf] | 34.5 ng / Pa•s•m2 [0.603 US Perms] @ 33mm [1.3″] | 56 ng / Pa•s•m2 [0.979 US Perms] @ 50mm [2.0″] | 0.0213 L/(s • m2) @ 75 Pa [0.0043 cfm /ft2 @ 1.57 psf] @ 39mm [1.5″] |
Air Barrier Construction Design Details |
Barnhardt Manufacturing Company dba NCFI Polyurethaneswww.ncfi.com
InsulStar®, InsulBloc®
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0003 L/(s • m2) @ 75 Pa [0.00005 cfm /ft2 @ 1.57 psf] @ 25mm [1″] | 56 ng / Pa•s•m2 [0.97 US Perms] @ 20mm [0.80″] | 134 ng / Pa•s•m2 [2.35 US Perms] @ 20mm [0.80″] | 0.0032 L/(s • m2) @ 75 Pa [0.00064 cfm /ft2 @ 1.57 psf] @ 37mm [1.5″] |
Air Barrier Construction Design Details |
BASF – The Chemical Groupwww.spf.basf.com
Walltite
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00032 L/(s • m2) @ 75 Pa [0.000064 cfm /ft2 @ 1.57 psf] @ 32mm [1.3″] | 79.6 ng / Pa•s•m2 [1.39 US Perms] @ 25mm [1.0″] | 241 ng / Pa•s•m2 [4.22 US Perms] @ 25mm [1.0″] | 0.0076 L/(s • m2) @ 75 Pa [0.0015 cfm /ft2 @ 1.57 psf] @ 25mm [1.0″] |
Air Barrier Construction Design Details |
CertainTeed Corporationwww.certainteed.com
CertaSpray CC
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00076 L/(s • m2) @ 75 Pa [0.000152 cfm /ft2 @ 1.57 psf] @ 27mm [1.06″] | 56 ng / Pa•s•m2 [0.98 US Perms] @ 36mm [1.42″] | 102 ng / Pa•s•m2 [1.79 US Perms] @ 47mm [1.85″] | 0.008 L/(s • m2) @ 75 Pa [0.0016 cfm /ft2 @ 1.57 psf] @ 25mm [1.0″] |
Air Barrier Construction Design Details |
Demilecwww.demilec.com
Heatlok Soy 200 Plus
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.004 L/(s • m2) @ 75 Pa [0.0008 cfm /ft2 @ 1.57 psf] @ 25mm [1.0″] | 1.131 US Perms @ 25mm [1.0″] | 0.0022 L/(s • m2) @ 75 Pa [0.00044 cfm /ft2 @ 1.57 psf] @ 100mm [4.0″] |
Air Barrier Construction Design Details |
Heatlok XT
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.020 L/(s • m2) @ 75 Pa [0.004 cfm /ft2 @ 1.57 psf] @ 25mm | 70.5 ng / Pa•s•m2 [1.23 US Perms] @ 25mm | 119 ng / Pa•s•m2 [2.08 US Perms] @ 25mm | 0.0383 L/(s • m2) @ 75 Pa [0.0076 cfm /ft2 @ 1.57 psf] @ 50mm [2.0″] |
Air Barrier Construction Design Details |
Gaco Westernwww.gaco.com
Gaco WallFoam 183M
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0013 L/(s • m2) @ 75 Pa [0.0003 cfm /ft2 @ 1.57 psf] @ 36mm [1.42″] | 35.9 ng / Pa•s•m2 [0.628 US Perms] @ 50mm [2.0″] | 63 ng / Pa•s•m2 [1.1 US Perms] @ 50mm [2.0″] | 0.00273 L/(s • m2) @ 75 Pa [0.000546 cfm /ft2 @ 1.57 psf] @ 25mm [1.0″] |
Air Barrier Construction Design Details |
Henry Companywww.henry.com
Permax 2.0
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0005 L/(s • m2) @ 75 Pa [0.000098 cfm /ft2 @ 1.57 psf] | 27 ng / Pa•s•m2 [0.472 US Perms] @ 52.8mm [2.078″] | 84 ng / Pa•s•m2 [1.46 US Perms] @ 63.5mm [2.5″] | < 0.0025 L/(s • m2) @ 75 Pa [< 0.00049 cfm /ft2 @ 1.57 psf] @ 50mm [2.0″] |
Air Barrier Construction Design Details |
Icynene Inc.www.icynene.com
MD-C-200
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0008 L/(s • m2) @ 75 Pa [0.00016 cfm /ft2 @ 1.57 psf] @ 52mm [2.05″] | 50.6 ng / Pa•s•m2 [0.884 US Perms] @ 37mm [1.5″] | 2748 ng / Pa•s•m2 [48.09 US Perms] @ 50mm [2.0″] | 0.0803 L/(s • m2) @ 75 Pa [0.0161 cfm /ft2 @ 1.57 psf] @ 50mm [2.0″] |
Air Barrier Construction Design Details |
ProSeal (MD-C-200-v3)
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00150 L/(s • m2) @ 75 Pa [0.00030 cfm /ft2 @ 1.57 psf] @ 32 mm [1.29″] | 68.9 ng / Pa•s•m2 [1.205 US Perms] @ 25mm [1.0″] | 74 ng / Pa•s•m2 [1.3 US Perms] @ 50mm [1.0″] | 0.0106 L/(s • m2) @ 75 Pa [0.00212 cfm /ft2 @ 1.57 psf] @ 25mm [1.0″] |
Air Barrier Construction Design Details |
Johns Manvillewww.specjm.com
Corbond III
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.000244 L/(s • m2) @ 75 Pa [0.000049 cfm /ft2 @ 1.57 psf] @ 50mm [2.0″] | 53 ng / Pa•s•m2 [0.927 US Perms] @ 50mm [2.0″] | 120 ng / Pa•s•m2 [2.0 US Perms] @ 25mm [1.0″] | 0.0915 L/(s • m2) @ 75 Pa [0.0183 cfm /ft2 @ 1.57 psf] @ 37mm [1.5″] |
Air Barrier Construction Design Details |
Lapolla Industries Inc.www.lapolla.com
Foam-Lok AB2000
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.000244 L/(s • m2) @ 75 Pa [0.000049 cfm /ft2 @ 1.57 psf] @ 50mm [2.0″] | 49 ng / Pa•s•m2 [0.8 US Perms] @ 50mm [1.97″] | 90 ng / Pa•s•m2) [1.58 US Perms) @ 50mm [2.0″] | 0.0915 L/(s • m2) @ 75 Pa [0.0183 cfm /ft2 @ 1.57 psf] @ 37mm [1.5″] |
Air Barrier Construction Design Details |
Mechanically Fastened Commercial Building Wrap Section 072708
DuPont Building Innovationswww.weatherization.tyvek.com
Tyvek® CommercialWrap®
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0023 L/(s • m2) @ 75 Pa [0.00046 cfm /ft2 @ 1.57 psf] | 1446 ng / Pa•s•m2 [25.31 US Perms] | 1867 ng / Pa•s•m2 [32.68 US Perms] | 0.05 L/(s • m2) @ 75 Pa [0.01 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Tyvek® CommercialWrap® D
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00225 L/(s • m2) @ 75 Pa [0.00045 cfm /ft2 @ 1.57 psf] | 2437 ng / Pa•s•m2 [42.65 US Perms] | 2427 ng / Pa•s•m2 [42.48 US Perms] | 0.0803 L/(s • m2) @ 75 Pa [0.0158 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Kingspan Insulation LLCwww.trustgreenguard.com
GreenGuard® MAX™ Building Wrap
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
< 0.001 L/(s • m2) @ 75 Pa [< 0.0002 cfm /ft2 @ 1.57 psf] | 773 ng / Pa•s•m2 [13.52 US Perms] | < 0.05 L/(s • m2) @ 75 Pa [< 0.01 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
GreenGuard® RainDrop® 3D Building Wrap
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
< 0.001 L/(s • m2) @ 75 Pa [< 0.0002 cfm /ft2 @ 1.57 psf] | 705 ng / Pa•s•m2 [12.33 US Perms] | < 0.05 L/(s • m2) @ 75 Pa [< 0.01 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
GreenGuard® C2000
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
< 0.003 L/(s • m2) @ 75 Pa [< 0.0006 cfm /ft2 @ 1.56 psf] | 5377 ng / Pa•s•m2 [94 US Perms] | < 0.05 L/(s • m2) @ 75 Pa [< 0.01 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Boardstock – Rigid Cellular Thermal Insulation Board Section 072723
Dow Chemical Companywww.dow.com
Styrofoam Ultra SL
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0012 L/(s • m2) @ 75 Pa [0.00023 cfm /ft2 @ 1.57 psf] @ 1.0″ [25mm] thick foam sheathing | <62.9 ng / Pa•s•m2 [<1.1 US Perms] @ 1.0″ [25mm] thick foam sheathing | 0.02072 L/(s • m2) @ 75 Pa [0.004144 cfm /ft2 @ 1.57 psf] @ 1.75″ [44mm] thick foam sheathin |
Thermax Wall System
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.001 L/(s • m2) @ 75 Pa [0.0002 cfm /ft2 @ 1.57 psf] @ 1/2″ [13mm] thick foam sheathing | 2.29 ng / Pa•s•m2 [0.04 US Perms] @ 1.0″ [25mm] thick foam sheathing | 0.05 L/(s • m2) @ 75 Pa [0.01 cfm /ft2 @ 1.57 psf] @ 5/8″ [16mm] thick foam sheathing |
Air Barrier Construction Design Details |
Ultra Wall Air Barrier System
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0012 L/(s • m2) @ 75 Pa [0.00023 cfm /ft2 @ 1.57 psf] @ 1.0″ [25mm] thick foam sheathing | <62.9 ng / Pa•s•m2 [<1.1 US Perms] @ 1.0″ [25mm] thick foam sheathing | 0.0803 L/(s • m2) @ 75 Pa [0.01606 cfm /ft2 @ 1.57 psf] @ 1.5″ [38mm] thick foam sheathing |
Air Barrier Construction Design Details |
Johns Manvillewww.specjm.com
AP Foil-Faced
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0007 L/(s • m2) @ 75 Pa [0.00013 cfm /ft2 @ 1.57 psf] @ 1.0″ [25mm] thick foam sheathing | 3 ng / Pa•s•m2 [0.06 US Perms] @ 1.0″ [25mm] thick foam sheathing | 0.0064 L/(s • m2) @ 75 Pa [0.00128 cfm /ft2 @ 1.57 psf] @ 1.0″ [25mm] thick foam sheathing |
Air Barrier Construction Design Details |
Factory-Bonded Membranes to Sheathing ABAA Model Spec currently in development
Georgia-Pacificwww.buildgp.com
Dens Element Barrier System
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00510 L/(s • m2) @ 75 Pa [0.00086 cfm /ft2 @ 1.57 psf] – 5/8th board | 55.30 ng / Pa•s•m2 [22.9 US Perms] – 5/8th board | 660.80 ng / Pa•s•m2 [22.42 US Perms] – 5/8th board | 0.0802 L/(s • m2) @ 75 Pa [0.01604 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Sopremawww.soprema.ca
Sopraseal Xpress G
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.00834 L/(s • m2) @ 75 Pa [0.001668 cfm /ft2 @ 1.57 psf] | 1.22 ng / Pa•s•m2 [0.0214 US Perms] | 1.10 ng / Pa•s•m2 [0.0193 US Perms] | 0.038 L/(s • m2) @ 75 Pa [0.0076 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
USG / Tremcowww.securockexoair.com
Securock ExoAir 430 System
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0001 L/(s • m2) @ 75 Pa [< 0.00002 cfm /ft2 @ 1.57 psf] | 105.24 ng / Pa•s•m2 [1.84 US Perms] | 279.70 ng / Pa•s•m2 [4.89 US Perms] | < 0.02 L/(s • m2) @ 75 Pa [< 0.004 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Adhesive Backed Commercial Building Wrap ABAA Model Spec currently in development
Dörken Systems Inc.www.dorken.com
DELTA-VENT SA
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0015 L/(s • m2) @ 75 Pa [0.0003 cfm /ft2 @ 1.57 psf] | 1763 ng / Pa•s•m2 [30.9 US Perms] | 2830 ng / Pa•s•m2 [49.5 US Perms] | 0.039 L/(s • m2) @ 75 Pa [0.0078 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Soprema Inc.www.soprema.us
SopraSEAL STICK VP
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0024 L/(s • m2) @ 75 Pa [0.00048 cfm /ft2 @ 1.57 psf] | 614 ng / Pa•s•m2 [10.7 US Perms] | 978 ng / Pa•s•m2 [17.1 US Perms] | < 0.005 L/(s • m2) @ 75 Pa [< 0.001 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
Vaproshieldwww.vaproshield.com
REVEALSHIELD SA
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0001 L/(s • m2) @ 75 Pa [0.00002 cfm /ft2 @ 1.57 psf] | 1600 ng / Pa•s•m2 [28.07 US Perms] | 3630 ng / Pa•s•m2 [63.48 US Perms] | <0.01 L/(s • m2) @ 75 Pa [<0.01 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
WRAPSHIELD SA
Test Results | ||||
---|---|---|---|---|
Air Permeance (ASTM E2178) | Water Vapor Permeance (ASTM E96 – desiccant method) | Water Vapor Permeance (ASTM E96 – water method) | Air Leakage of Building Assembly (ASTM E2357) | Details & Specs |
0.0001 L/(s • m2) @ 75 Pa [0.00002 cfm /ft2 @ 1.57 psf] | 1630 ng / Pa•s•m2 [28.46 US Perms] | 2510 ng / Pa•s•m2 [43.85 US Perms] | <0.01 L/(s • m2) @ 75 Pa [<0.01 cfm /ft2 @ 1.57 psf] |
Air Barrier Construction Design Details |
If you have any questions please contact the ABAA office by email at abaa@airbarrier.org or by phone at 866-956-5888.